There was a washout under rail tracks in Madison Township and repairs are under way.

Truckloads of gravel and fill dirt have been adding to piles at the old train depot on Madison Street and then sent by rail to the washout area.

A two-mile long train is stopped on the tracks between Fillmore and Greencastle waiting for repairs to be completed.

Dispatchers for CSX in Atlanta say the rails should be repaired and trains up and running sometime Thursday night or Friday morning.

© 2024 Greencastle Banner-Graphic