This 90-foot wind turbine with 8-foot-long blades generates 1,000 watts of power for Union City Community High School. School officials have a project planned for a 700-kilowatt-hour tower that would power the entire school. (KYLE EVENS / THE STAR PRESS)
By Joy Leiker, Star Press
jleiker@munice.gannett.com
UNION CITY -- The school with the state's first hybrid bus wants to have the first campus fully powered by wind energy.
Copyright ©2024 The Star Press