This 90-foot wind turbine with 8-foot-long blades generates 1,000 watts of power for Union City Community High School. School officials have a project planned for a 700-kilowatt-hour tower that would power the entire school. (KYLE EVENS / THE STAR PRESS)
This 90-foot wind turbine with 8-foot-long blades generates 1,000 watts of power for Union City Community High School. School officials have a project planned for a 700-kilowatt-hour tower that would power the entire school. (KYLE EVENS / THE STAR PRESS)

By Joy Leiker, Star Press

jleiker@munice.gannett.com

UNION CITY -- The school with the state's first hybrid bus wants to have the first campus fully powered by wind energy.

Copyright ©2024 The Star Press